Details

Project Type
Fit Out

Duration
40 Weeks

Size
38,100 Sq Ft

 

 

 

Aldi Stores Ltd.

Northern Distribution Centre, Bathgate

GHI were responsible for the entire internal fit-out from the basic shell and core construction, of the office accommodation and the amenity block, working through Aldi’s manager’s, RGP. The project included floor screed, external wall linings, metal ceilings, floor finishes, joinery, and construction of all internal partitioning.

The final decoration and soft furnishings combine with the specialist doors to achieve the requisite high acoustic reduction, and provide a clean, crisp appearance throughout.

GHI undertook the construction and fit-out of the distribution workstations and toilets within the warehouse facility, all shower rooms and kitchens.

GHI provided design development input from an early stage, through haa design, fulfilling the ethos of service from concept to completion and beyond.