Red Hub, Heriot Watt University, Edinburgh

Red Hub, Heriot Watt University, Edinburgh

Project: Office Fit-out
Programme: 17 Weeks
Consultant: ADP Architecture

GHI returned to Heriot Watt University after having completed many successful projects previously.

The works involved internal alterations to the Level 2 office space within the Hugh Nisbet Building. The space was stripped back to a shell, to allow construction of a new open plan office, meeting spaces and staff W.C facilities.

M&E services were replaced alongside the construction of new partitioning, ceilings, floor and finishes to suit the new layout. The scope also included replacement of the curtain wall / perimeter window system, following the removal of asbestos.

The Hugh Nisbet Building remained in occupation for the summer for the full programme duration of the work, mitigated by the appropriate safety measures to maintain functionality and deliver construction works to the required programme.